We had provided Precast Solution to execute full precast frame column-beam system 4 floors underground, while superstructure is conventional system with 5 floor ( total

Difficult Façade design, but we had achieved to Project requirements and Quality

Performed Precast design to convert conventional construction to Precast full frame column-beam and achieved all requirements of stability, Drift values and column/beam moment connections.

Optimizing the construction methodology with using Precast system within design stage, do all structural ceiling by Hollow core slabs, UHPC Screens of Façade, Precast pattern

we have converted from We proposed to convert the system from conventional to Full Precast Hypird system,